Mulyana, Ig. Jaka, Gunawan, Ivan, Angelia, Yunia Vera and Trihastuti, Dian (2020) A Hybrid Simulation Study to Determine an Optimal Maintenance Strategy. A Hybrid Simulation Study to Determine an Optimal Maintenance Strategy, 19 (2). pp. 146-155. ISSN p-ISSN: 2088-4842, e-ISSN: 2442-8795, Jurnal Nasional Terakreditasi Peringkat 2
Preview |
Text (A Hybrid Simulation Study to Determine an Optimal Maintenance Strategy)
10-A_hybrid_simulation_study_.pdf Download (1MB) | Preview |
Preview |
Text (A Hybrid Simulation Study to Determine an Optimal Maintenance Strategy)
10-A_hybrid_simulation_study_Hasil Cek Similarity.pdf Download (3MB) | Preview |
Preview |
Text (A Hybrid Simulation Study to Determine an Optimal Maintenance Strategy_peer_review)
10-R1&2-A_hybrid_simulation_study_.pdf Download (911kB) | Preview |
Text (A Hybrid Simulation Study to Determine an Optimal Maintenance Strategy_Koresponden_)
10. A Hybrid SimulaƟon Study to_Koresponden_.pdf Download (307kB) |
Abstract
With the increasing complexity of the process industry, having excellent maintenance management is essential for manufacturing industries. Various parts that interact and interdependent with each other make a well-planned maintenance strategy is one of the major challenges faced by industry. The whole system could be interrupted just simply because of the failure of a component. Therefore, a review of a maintenance strategy must be done from a system perspective. It is suggested that the optimal preventive maintenance time interval is not only determined by the lowest maintenance cost of each machine but also its impact on the whole system. Two main indicators that can accommodate the system perspective are reliability and revenue. A large number of machines and the array of machines can be synthesized using reliability indicators. Moreover, the creation of maximum revenue is always the main goal for a business. Therefore, in this study, the best maintenance strategy will be determined from the revenue obtained by a process industry which operates a well known flour mill in Surabaya. A hybrid approach is proposed using Monte Carlo simulation to observe the machine individually from which the results are reviewed using the application of System Dynamics. From three improvement scenarios, a scenario 2 with a recommendation of setting the preventive maintenance time interval considering resource availability, was finally chosen because it was able to generate the highest revenue at the end of the period.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Maintenance strategy, monte carlo simulation, system dynamics, preventive planned maintenance, corrective maintenance |
Subjects: | Engineering > Industrial Engineering |
Divisions: | Journal Publication |
Depositing User: | F.X. Hadi |
Date Deposited: | 02 Feb 2021 03:11 |
Last Modified: | 21 Sep 2022 04:07 |
URI: | http://repository.ukwms.ac.id/id/eprint/25125 |
Actions (login required)
View Item |