Application of Improved Multistage Vehicle Routing Problem With Time Window

Dewi, Dian Retno Sari, Rahaju, Dini Endah Setyo and Anjani, Lisa (2014) Application of Improved Multistage Vehicle Routing Problem With Time Window. Application of Improved Multistage Vehicle Routing Problem With Time Window, 9 (9). pp. 1405-1408. ISSN 1819-6608

[thumbnail of Application of Improved Multistage Vehicle Routing Problem With Time Window] Text (Application of Improved Multistage Vehicle Routing Problem With Time Window)
3-Application_of_improved_multistage_.pdf

Download (154kB)
[thumbnail of Application of Improved Multistage Vehicle Routing Problem With Time Window] Text (Application of Improved Multistage Vehicle Routing Problem With Time Window)
6-Application_of_improved_multistage_hasil cek similarity.pdf

Download (992kB)

Abstract

This paper presented an application of improved multistage vehicle routing problem with time window. By using this improved method, we can solve a multistage vehicle routing problem issue. We applied this model for two layers multistage. First layer consist of only one depot which distribute items among the distributors, second layer consist of several distributors which distribute items among several retailers. Adaptation to Larsen model was for second layer, which consist of several distributors which distribute to several retailers. Meanwhile Larsen model only worked on one depot which distribute among several distributors. In this model, we worked on two steps. First step is to solve second layer problems. We must determine the delivery area of retailers among the distributors by combine all possible path to minimize distance within capacity vehicle constraint and time window constraint. Next step was to solve first layer problem. We worked with Larsen model for solving the first layer. Using this improved multistage vehicle routing problem with time window helped to solve multistage vehicle routing problem as well as minimize distance.

Item Type: Article
Uncontrolled Keywords: multistage, mathematical modelling, time window, vehicle routing problems
Subjects: Engineering > Industrial Engineering
Divisions: Journal Publication
Depositing User: F.X. Hadi
Date Deposited: 21 Mar 2023 09:31
Last Modified: 03 May 2023 05:49
URI: http://repository.ukwms.ac.id/id/eprint/34455

Actions (login required)

View Item View Item