Work Measurement Approach to Determine Standard Time in Assembly Line

Hartanti, Lusia Permata Sari (2016) Work Measurement Approach to Determine Standard Time in Assembly Line. Work Measurement Approach to Determine Standard Time in Assembly Line, 2 (10). pp. 192-195. ISSN 2394-7926

[thumbnail of Work Measurement Approach to Determine Standard Time in Assembly Line] Text (Work Measurement Approach to Determine Standard Time in Assembly Line)
1-Work_measurement_approach_.pdf

Download (381kB)
[thumbnail of Work Measurement Approach to Determine Standard Time in Assembly Line_peer_review_] Text (Work Measurement Approach to Determine Standard Time in Assembly Line_peer_review_)
1-R1&2-Work_measurement_approach_.pdf

Download (1MB)
[thumbnail of Work Measurement Approach to Determine Standard Time in Assembly Line] Text (Work Measurement Approach to Determine Standard Time in Assembly Line)
1-Work_measurement_approach_Hasil Cek Similarity.pdf

Download (1MB)
[thumbnail of Work Measurement Approach to Determine Standard Time in Assembly Line_Koresponden_] Text (Work Measurement Approach to Determine Standard Time in Assembly Line_Koresponden_)
1. Work Measurement Approach_Koresponden_.pdf

Download (597kB)

Abstract

Productivity measure output to input. Work measurement is a tool to increase productivity of industrial and business area. The aim of this research is to determine standardtime of assembly process. The research was conducted at a manufacture industry in Indonesia that produce plastic product. Several production lines in company are using manual process, for example assembly work station, where as a bottleneck workstation. Work measurement is conducted in order to improve the productivity of assembly workstation. Time study is working measurement technique consisting time measurement of worker that doing jobs in normal pace. Performance rating and allowance are added into observed time to calculate standard time.

Item Type: Article
Uncontrolled Keywords: Productivity, Work measurement, Time Study, Standard Time.
Subjects: Engineering > Industrial Engineering
Divisions: Journal Publication
Depositing User: F.X. Hadi
Date Deposited: 03 Sep 2021 07:21
Last Modified: 21 Sep 2022 02:55
URI: http://repository.ukwms.ac.id/id/eprint/26279

Actions (login required)

View Item View Item